COA: 77.77 GBp
translate icon
Startseite • Case Studies • Intensifying natural light in Bangladesh
Intensifying natural light in Bangladesh

Intensifying natural light in Bangladesh

Our manufacturing plants in Bangladesh have benefitted from eSight for over two years.

Using the eSight monitoring data in Chittagong and Gazipur, the team implemented an initiative to improve daytime factory shopfloor light intensity, while in parallel reducing our energy consumption.

Through the rooftop installation of innovative, reflective solar tubing, the dimmest of external natural light can be intensified and channelled internally to internal work-stations. With marginal investment, the tracked energy savings across both plants are in excess of 25 megawatt hours per annum.